Facilities Management/Planning: Difference between revisions

From University of Nebraska Medical Center
Jump to navigation Jump to search
No edit summary
mNo edit summary
Line 58: Line 58:
Furniture procurement costs are incurred by the department assigned to the area.
Furniture procurement costs are incurred by the department assigned to the area.
==Additional information==
==Additional information==
*Contact [mailto:lindsay.neemann@unmc.edu Facilities Management & Planning, 402-559-5300
*Contact [mailto:lindsay.neemann@unmc.edu Facilities Management & Planning], 402-559-5300
*See the [https://www.unmc.edu/facilities/ FM&P website]
*See the [https://www.unmc.edu/facilities/ FM&P website]


This page maintained by [mailto:dpanowic@unmc.edu dkp].
This page maintained by [mailto:dpanowic@unmc.edu dkp].

Revision as of 16:29, February 22, 2022

Human Resources   Safety/Security   Research Compliance   Compliance   Privacy/Information Security   Business Operations   Intellectual Property   Faculty


General Accounting | SBIR/STTR Program Participation | Supplemental Compensation Plan | Facilities Management/Planning | Purchasing | Public Affairs | Facility Identification | Serving Alcoholic Beverages | Travel and Reimbursement | State Vehicles | Reproducing Copyrighted Materials | Bank Card Processing | Student Training Agreement | Volunteer | Cash Handling | Fraud | Assigning Research Lab Space | Space Scheduling and Fundraising | Academic Personnel Records | Cellular Phone | Off-campus Graphic Design and Related Printing | Off-campus Photography | Tax Exempt Financing and Tracking of Both Qualified Use and Non-Qualified Use of Research Space | Secondary Logos | Social Media | Sensitive Equipment Tracking | International Visitors | Accounts Receivable Management | Internal Audit | Regulations on the Use of University Facilities and Grounds

Policy No.: 4000
Effective Date: 07/01/98
Revised Date: 02/22/22
Reviewed Date: 02/22/22

Facilities Management & Planning Policy

Basis for Facilities Management & Planning Policy

To maintain compliance with federal, state and local and University of Nebraska requirements involving construction, utilities, hazard exposure, energy conservation, etc., Facilities Management & Planning (FM&P) is responsible for the planning, construction and maintenance of University of Nebraska Medical Center (UNMC) buildings and grounds, and utilities infrastructure. FM&P is the code authority for the University of Nebraska on our campus.

Building Repair and Maintenance

Facilities Management & Planning shall maintain buildings and campus utility distribution systems. By definition, building repair and maintenance, in the broadest sense, encompass those items which are part of the original construction and are physically part of, and attached to, the permanent structure. It is not the intention of FM&P to secure, install or maintain any item or area which is occupied or used in conjunction with a department that is funded through a special agency.

Utility interruptions or problems should be promptly reported to FM&P, so the cause of the interruption or problem can be determined and corrected.

Capital Improvement Projects, Construction Contracts and Bids

Capital improvement projects are defined as any remodeling, renovation, maintenance or construction work in which the project budget costs are over $10,000, unless project supervision or design services are required. If those services are required, construction work over $5,000 will be considered as capital improvement projects. The handling and processing of construction contracts and bids is the responsibility of Facilities Management & Planning.

All items removed during demolition or remodeling which have a dollar value shall be disposed of in accordance with University procedures. By definition, valued goods, in the broadest sense, encompass those items which may or may not be inventoried, have a dollar value if sold on the local market and are to be disposed of and removed from the remodeling area. Examples include drapes, blinds and rods, cabinets, carpet, doors and frames, light fixtures, or ceiling tile and grids.

Work Conducted Within Building Systems

All maintenance, construction, repair, installation or other similar work conducted above a ceiling, within a wall, under a floor covering, etc., shall be conducted by or coordinated through FM&P. This ensures that all such work is conducted in compliance with applicable building codes, building standard practices, dust containment, procedures pertaining to asbestos and other hazardous materials, etc. It is recognized that other organizations may have a routine need to conduct such work. In this case, FM&P may authorize the organization to perform such work, provided the organization demonstrates the capacity to comply with the intent of this policy.

Energy Management

Facilities Management & Planning will manage the use of energy resources in a manner consistent with national energy conservation policies while providing full services necessary to accomplish the goals of UNMC.

Space Planning & Interior Decorating

In order to maintain a consistent appearance and quality on the campus, and to ensure the University complies with all regulations (including the Americans with Disabilities Act and applicable building codes), requests for the following must be reviewed and approved by Facilities Management & Planning:

  • Renovation and construction services
  • Furniture, either new or re-use
  • Space planning and space assignment requests
  • Signage, both external and internal

Furniture and equipment must be procured through an FM&P-approved vendor to assure compliance with regulatory, warranty, and durability standards. Furniture procurement costs are incurred by the department assigned to the area.