On-Campus and Off-Campus Indirect Cost Rates on Federally Sponsored Projects: Difference between revisions
Jump to navigation
Jump to search
mNo edit summary |
No edit summary |
||
Line 46: | Line 46: | ||
'''Preponderance of work:''' Time and effort, or salary costs, is generally accepted as a measure of work performed in terms of the total project. When 50% or more of budgeted UNMC time and effort is to be performed on-campus, the on-campus rate applies. Subcontracts need to be excluded from determining the preponderance of work.<br /> | '''Preponderance of work:''' Time and effort, or salary costs, is generally accepted as a measure of work performed in terms of the total project. When 50% or more of budgeted UNMC time and effort is to be performed on-campus, the on-campus rate applies. Subcontracts need to be excluded from determining the preponderance of work.<br /> | ||
''' | '''Work''' in the context of research activities, can include the following types of activities: | ||
*development of ideas, processes, theories | *development of ideas, processes, theories | ||
*data collection, evaluation and/or analysis | *data collection, evaluation and/or analysis |