Grant Equipment: Difference between revisions

Jump to navigation Jump to search
no edit summary
No edit summary
(3 intermediate revisions by the same user not shown)
Line 33: Line 33:
     </tr>
     </tr>
     <tr>
     <tr>
         <td width="60%">Section 6.0 - Policy</td>
         <td width="60%">Section 6.0 - Facilities and Resources</td>
         <td width="40%">Originating Date: April, 1996</td>
         <td width="40%">Originating Date: April 1996</td>
     </tr>
     </tr>
      
      
Line 43: Line 43:
             <table width="100%" cellpadding="0" cellspacing="0">
             <table width="100%" cellpadding="0" cellspacing="0">
                 <tr>
                 <tr>
                 <td>Revised: August, 1998<br />Revised: [[Grant Equipment Policy version February 2008|February, 2008]]<br />Revised: March, 2015</td>
                 <td>Revised: August 1998<br />Revised: [[Grant Equipment Policy version February 2008|February 2008]]<br />Revised: March 2015</td>
                 </tr>
                 </tr>
             </table>
             </table>
Line 57: Line 57:
<br />
<br />
===Policy===
===Policy===
<ol>
<ol style="max-width:70em !important;">
   <li style="margin-bottom:15px;text-indent:3em;">'''Purchase of Equipment'''
   <li style="margin-bottom:15px;text-indent:3em;">'''Purchase of Equipment'''
       <ol style="list-style-type: lower-alpha;">
       <ol style="list-style-type: lower-alpha;">
         <li style="margin-bottom:15px;text-indent:3em;">The College of Nursing follows all UNMC ([[Purchasing|Policy 5000]]), University of Nebraska and State guidelines regarding the purchase of equipment.</li>
         <li style="margin-bottom:15px;text-indent:0em;">The College of Nursing follows all UNMC ([[Purchasing|Policy 5000]]), University of Nebraska and State guidelines regarding the purchase of equipment.</li>
         <li style="margin-bottom:15px;text-indent:0em;">All equipment purchased on a grant, on which the Principal Investigator (PI) or Project Director (PD) is a faculty member in the College of Nursing, is the property of the College.  </li>
         <li style="margin-bottom:15px;text-indent:0em;">All equipment purchased on a grant, on which the Principal Investigator (PI) or Project Director (PD) is a faculty member in the College of Nursing, is the property of the College.  </li>
         <li style="margin-bottom:15px;text-indent:0em;">The PI/PD initiates the purchase of research equipment through the Administrator in the Niedfelt Nursing Research Center (NNRC).  The Workstation Specialists must be consulted about the purchase of computer equipment and must authorize and place into inventory all such hardware and software.  Instructional equipment needs should be reviewed by the appropriate Learning Resource Center Coordinator.  </li>
         <li style="margin-bottom:15px;text-indent:0em;">The PI/PD initiates the purchase of research equipment through the Administrator in the Niedfelt Nursing Research Center (NNRC).  The Workstation Specialists must be consulted about the purchase of computer equipment and must authorize and place into inventory all such hardware and software.  Instructional equipment needs should be reviewed by the appropriate Learning Resource Center Coordinator.  </li>

Navigation menu