Grant Equipment: Difference between revisions

Jump to navigation Jump to search
Line 74: Line 74:


====Disposition of Equipment After Termination of the Grant Period====
====Disposition of Equipment After Termination of the Grant Period====
<p style="max-width:70em !important; margin-left:3em; text-indent:0em;">After a grant has ended, equipment purchased by the grant becomes part of the general CON pool unless it is actively being used by the PI, PD or their designee for a CON related purpose or unless negotiated otherwise with the CON Director, Administration & Operations.  Once placed into the general pool, the PI/PD will have priority for subsequent use of that equipment for six months.</p>
<p style="max-width:70em !important; margin-left:3em; text-indent:0em;">After a grant has ended, equipment purchased by the grant becomes part of the general CON pool unless it is actively being used by the PI/PD or their designee for a CON related purpose or unless negotiated otherwise with the CON Director, Administration & Operations.  Once placed into the general pool, the PI/PD will have priority for subsequent use of that equipment for six months.</p>


====Disposition of Equipment for Faculty Leaving CON====
====Disposition of Equipment for Faculty Leaving CON====

Navigation menu